EC18009 Charleston Screen Kit
Introduction
Important Safety Notes:
- Assemble product on a smooth, non-abrasive surface to prevent scratching
- Use proper tools and protective equipment during assembly
- We recommend two people for a smoother assembly experience
- Do not use excessive force when assembling components
Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away. If a return is still necessary, it must be initiated with the retailer where the product was purchased.
Need Help or Replacement Parts?
If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is ready to help:
- Website: https://parts.nychbrands.com
- Email: support@encloscreens.com
- Phone: 704-892-5222 or 877-234-6196
Customer service agents are available 9am–5pm EST, Monday–Friday.
For Quick Assistance:
- Have reference item number EC18009
- Provide the specific part name
- Include the batch lot number found on the end of the box
Product Specifications & Dimensions
Required Tools for Assembly
Power Drill & Drill Bit are recommended for a smoother installation experience. Not included.
Lay Out Materials
A- Left Post (2)
1¼" x 1¼" x 42"
B- Right Post (2)
1¼" x 1¼" x 42"
C- Board (20)
⅝" x 2⅝" x 38"
D- Post Anchor (4)
⅞" x 1⅑" x 17"
E- Post Cap (4)
F- Wood Assembly Spacer (2)
G- Spacer (36)
⅞" x 1⅑" x 1⅑"
H- Joiner Clip (2)
1⁄13" x ¾" x 1¾"
I- 1" Stainless Steel Screw (20)
J- ⅛" Steel Drill Bit (1)
Step 1: Assemble Posts
A x1 
B x1 
-
The end of each post marked with a sticker indicates the top.
-
Assemble on box or other smooth surface to prevent scratching.
Step 2: Insert First Board
C x1 
Step 3: Install Wood Inserts
F x2 
- Ensure the wood spacers are flush with the bottom of the post
Step 4: Install Post Anchors
D x2 
- Ensure Post Anchors (D) are flush and align holes as shown.
Step 5: Secure Post Anchors In Posts
I x4 
Step 6: Add Spacers and Boards
C x9 
G x18 
- Orient Spacers (G) as shown in graphic.
- Insert Boards (C) into the grooves of the left and right posts in between each spacer.
Step 7: Secure Top of Panel
I x4 
- Drive 1" Stainless Steel Screws (I) into the pre-drilled holes to secure the boards.
- Repeat steps 1-6 to create second panel.
Step 8: Install Screens in Ground
- Attempt to push the unit into the ground.
- Tap posts using scrap wood block for protection.
- Check straightness with level.
- Distance from ground to bottom board is 2¼"
IF GROUND IS TOO HARD:
- Loosen ground and soak with water.
- OR use 1.5" Tulip Auger Drill Attachment.
Step 9: Connect Screens
H x2 
I x4 
J x1 
180° Installation
90° Installation
- Optional: Pre-drill your holes before placing screws.
- Using ⅛" Steel Drill Bit (J), pre-drill holes through the two holes in each Joiner Clip (H).
- Connect the screens using Joiner Clips (H) and 1" Stainless Steel Screws (I).
Step 10: Install Post Caps
E x4 
Need Help?
- Email: support@encloscreens.com
- Phone: 704-892-5222 or 877-234-6196
- Text: 980-580-6508