Florence Freestanding Patio Screen w/ Planter Box (Cedar) (44" H x 46 " W x 9" L) - Installation Guide
4ft H Florence Freestanding Patio Screen w/ Planter Box (Cedar) (1 Unit)
4ft Florence Planter Box

General Information

Important Safety Notes:

  • Check the inside of the larger pieces in your box for other materials packed inside.
  • When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching.
  • We recommend an area approximately 5' x 8' for unobstructed assembling.
  • You should not need to use excessive force when assembling components.

Returns:
If you wish to return your product, please contact us first — we can often help resolve the issue right away.
If a return is still necessary, it must be initiated with the retailer where the product was purchased.

Need Help or Replacement Parts?

If you need replacement parts, assembly assistance, or have questions about the product, our customer service team is ready to help:

Customer service agents are available 9am–5pm EST, Monday–Friday.

For Quick Assistance:

  • Have reference item number EC18006/EC18007
  • Provide the specific part name
  • Include the batch lot number found on the end of the box

Product Specifications & Dimensions

EC18007-EC18006 product dimensions

  • Planter Box Depth is 8 5/8" when floor is installed
  • Planter Box Volume is 1.6 cu.ft.

Power Drill with Phillips Bit

Measuring tape or tool is a required tool

Optional But Recommended to Avoid Tipping

  • Recommended for high wind environments
  • Surface mounting screws not included

Dirt install tools: rebar x2, hammer

Dirt:

  • ¾" Rebar (2)
  • Hammer

Deck install tools: drill, wood bit, lag screws

Deck:

  • Power Drill
  • Wood Drill Bit
  • ¼" Lag Screws 3" Length (4)
  • Matching Driver Bit

Patio install tools: hammer drill, concrete bit

Patio:

  • Hammer Drill
  • Concrete Drill Bit
  • ¼" Concrete Screws 2¼" Length (4)
  • Matching Driver Bit

Part Identification

A — Long Board (2)

Part A — Long Board ⅞" x 11" x 44"

B — Short Board (2)

Part B — Short Board ⅞" x 11" x 7¼"

C — Floor Board (1)

Part C — Floor Board ⅞" x 7¼" x 44"

D — Long Floor Support (2)

Part D — Long Floor Support

⅞" x 1½" x 29½"

E — Thin Horizontal Slat (8)

Part E — Thin Horizontal Slat ⅞" x 1½" x 44"

F — Wide Horizontal Slat (4)

Part F — Wide Horizontal Slat ⅞" x 3" x 44"

G — Right Post (1)

Part G — Right Post 1¾" x 1¾" x 44"

H — Left Post (1)

Part H — Left Post 1¾" x 1¾" x 44"

I — Spacer (24)

Part I — Spacer

J — Short Floor Support (3)

Part J — Short Floor Support ⅞" x 1½" x 7¼"

K — Short Post (2)

Part K — Short Post 1¾" x 1¾" x 11"

L — 1½" Self-Drilling Stainless Steel Screw (8)

Part L — 1½" Self-Drilling Screw

M — ¾" Self-Drilling Stainless Steel Screw (22)

Part M — ¾" Self-Drilling Screw

N — Corner Post Cap (4)

Part N — Corner Post Cap

O — Galvanized Steel L Bracket (2)

Part O — Galvanized Steel L Bracket

P — ⅛" Drill Bit (1)

Part P — ⅛" Drill Bit

Step 1

A × 1 Part A

Step 1 — Place Long Board (A) channel-up on smooth surface

  • Assemble on box or other smooth surface to prevent scratching.
  • Place board with channel facing up.

Step 2

D × 1 Part D

Step 2 — Position Long Floor Support (D) on board (A)

Step 3

Step 3 — Shift (D) until spacing is equal on either side

  • Shift part (D) until spacing is equal on either side.

Step 4

L × 4 Part L

Step 4 — Secure (D) to (A) with (4) screws (L); ensure parts are flush

  • Ensure that the side of part (A) and part (D) are flush.

Step 5

A × 1 Part A

D × 1 Part D

L × 4 Part L

Step 5 — Repeat steps 1–4 to create one additional panel

  • Repeat steps 1–4 to create one additional panel.

Step 6

K × 2 Part K

Step 6 — Attach (2) Short Posts (K); capped end faces down

  • Ensure capped end of post faces down as shown.
  • Ensure tabs on posts and notches on boards align.

Step 7

M × 4 Part M

Step 7 — Secure posts with (4) Corner Post Caps (M); flip panel

  • Flip panel.

Step 8

B × 2 Part B

Step 8 — Attach (2) Short Boards (B); ensure boards are flush

  • Lift panel.

Step 9

M × 4 Part M

Step 9 — Secure with (4) screws (M)

-Ensure that boards are flush.

Step 10

H × 1 Part H

G × 1 Part G

Step 10 — Attach Left Post (H) and Right Post (G); open channels facing each other

  • Open channels should be facing each other.

Step 11

M × 4 Part M

Step 11 — Secure posts with (4) screws (M)

  • Ensure posts are flush.

Step 12

A × 1 Part A

Step 12 — Attach Long Board (A); ensure board is flush

Step 13

M × 4 Part M

Step 13 — Secure with (4) screws (M)

  • Ensure board is flush.

Step 14

J × 4 Part J

Step 14 Align Part J

  • Align short floor supports with long floor supports.

Step 15

C × 1 Part C

Step 15 Place Floor Board and Drill Drainage Holes

  • Note: For best plant growth, it is recommended to drill (2) ¾" diameter drainage holes in part (C) roughly 12" apart.

Step 16

I × 2 Part I

Step 16 Align tab with notch on spacer

  • Align tab with notch on spacer.

Step 17

E × 1 Part E

Step 17 Slide Thin Horizontal Slat down posts

Step 18

E × 7 Part E

F × 4 Part F

I × 22 Part I

Step 18 Slide remaining slats into posts

  • Repeat steps 16 and 17, following the pattern shown above.

Step 19

M × 2 Part M

Step 19 Secure top slat using 4 screws

Step 20

N × 4 Part N

Step 20 Place Caps on top of posts

Step 21

Optional But Recommended to Avoid Tipping

  • Recommended for high wind environments
  • Surface mounting screws not included

Dirt install tools: rebar x2, hammer

Dirt:

  • ¾" Rebar (2)
  • Hammer

Deck install tools: drill, wood bit, lag screws

Deck:

  • Power Drill
  • Wood Drill Bit
  • ¼" Lag Screws 3" Length (4)
  • Matching Driver Bit

Patio install tools: hammer drill, concrete bit

Patio:

  • Hammer Drill
  • Concrete Drill Bit
  • ¼" Concrete Screws 2¼" Length (4)
  • Matching Driver Bit

Step 22 — Dirt Installation (Optional)

  • Recommended if installing into high wind environment.

Step 18.1 — Drive (2) rebar stakes alongside posts with hammer

Step 18.2 — Continue securing rebar anchors as illustrated

Step 23 — Deck / Patio Installation (Optional)

  • Recommended if installing into high wind environment.
  • Surface mounting screws not included.

Step 19 Deck — Install (4) ¼" lag screws into deck surface

Step 19 Patio — Install (4) ¼" concrete screws into patio

  • Re-install removed screw.

Step 19.23.1 — Pre-drill post with (P); re-install removed screw

Step 19.23.2 — Place Top Post Cap (Q) onto post

Step 19.23.3 — Install mounting screws per packaging instructions

  • Drill and install mounting screws according to instructions on screw packaging.

Step 19.23.4 — Repeat previous steps for left post

  • Repeat steps for left post.

Need Help?

We Are Part of
Site Logo
Visit Our Websites
Privacy Notice ©2024-Nych Brands Inc. or its affiliates